Engineering, procurement and Construction (EPC) projects in the oil and gas sector of Nigeria are under-researched. This leaves investors with little or no guide on the cost-overrun risks of oil and gas depot projects. Using the qualitative case study research technique, this study investigated cost overrun in the civil works of a petroleum products depot project in Lagos, Nigeria. The objectives were to ascertain the reasons for cost overrun and the areas of substantial cost overrun in the project. It was found that except for the cost of construction of “gantry” which was under-measured as a result of use of a wrong method of costing, the rest of the major facilities experienced cost overrun with a cumulative difference of 106%. It was also discovered that the cost overruns mainly originated from design and construction activities. The study recommends the timely engagement of consultants to review the conceptual designs of contractors and monitor the activities of EPC contractors for oil and gas depot projects on behalf of clients. Such consultants should not, however, have powers to control the contractors. As much as possible, parties to EPC contracts should use standard conditions of contract that will better reflect their intentions rather than contrive bespoke conditions.

References

  1. Odeck, J. (2004). Cost overruns in road construction—what are their sizes and determinants?. Transport policy, 11(1), 43-53.
     Google Scholar
  2. Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003). Megaprojects and risk: An anatomy of ambition. Cambridge University Press.
     Google Scholar
  3. Ali, A. S., & Kamaruzzaman, S. N. (2010). Cost performance for building construction projects in Klang Valley. Journal of Building Performance, 1(1).
     Google Scholar
  4. Derakhshanalavijeh, R., & Teixeira, J. M. C. (2017). Cost overrun in construction projects in developing countries, gas-oil industry of Iran as a case study. Journal of Civil Engineering and Management, 23(1), 125-136.
     Google Scholar
  5. Stewart, M. D., & Trierwiler, L. D. (2005). Simulating optimal tank farm design. PTQ magazine Q, 2, 1-5.
     Google Scholar
  6. Ehinomen, C., & Adeleke, A. (2012). An assessment of the distribution of petroleum products in Nigeria. E3 Journal of Business Management and Economics, 3(6), 232-241.
     Google Scholar
  7. Directorate of Petroleum Resources (DPR) (2018). Depots. Retrieved from https://www.dpr.gov.ng/wp-content/uploads/2018/08/depots.pdf.
     Google Scholar
  8. Pham, L. H., & Hadikusumo, H. (2014). Schedule delays in engineering, procurement, and construction petrochemical projects in Vietnam: A qualitative research study. International Journal of Energy Sector Management, 8(1), 3-26.
     Google Scholar
  9. Pícha, J., Tomek, A., & Löwitt, H. (2015). Application of EPC contracts in international power projects. Procedia Engineering, 123, 397-404.
     Google Scholar
  10. Mubin, S., & Mannan, A. (2013). Innovative Approach to Risk Analysis and Management of Oil and Gas Sector EPC Contracts from a Contractor's Perspective. Journal of Business & Economics, 5(2), 149.
     Google Scholar
  11. PricewaterhouseCoopers (2016) EPC Contracts in the oil and gas sector. Retrieved from https://www.academia.edu/34877653/EPC_Contracts_in_the_oil_and_gas_sector_EPC_Contracts_in_the_oil_and_gas_sector.
     Google Scholar
  12. Yeo, K. T., & Ning, J. H. (2002). Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects. International Journal of Project Management, 20(4), 253-262.
     Google Scholar
  13. Bidua, A. K. (2018). Use of FIDIC 2017 as Standard Form of Contract for EPC Projects in Oil and Gas Industry. Abu Dhabi International Petroleum Exhibition & Conference. doi:10.2118/193243-ms.
     Google Scholar
  14. International Federation of Consulting Engineers (FIDIC) (1999). Conditions of contract for EPC/Turnkey Projects. Retrieved from http://www.khabexport.com/upload/Files/fidic-silver-book.pdf.
     Google Scholar
  15. Schramm, C., Meißner, A., & Weidinger, G. (2010). Contracting strategies in the oil and gas industry. Pipeline Technology, 2010(Special Edition), 33-36.
     Google Scholar
  16. Ranjan, M. (2009). EPC: a better approach. Chemical Engineering World, 44(7), 46-49.
     Google Scholar
  17. International Federation of Consulting Engineers (FIDIC) (2020). EPC/Turnkey Contract 2nd Ed (2017 Silver Book). Retrieved from https://fidic.org/books/epcturnkey-contract-2nd-ed-2017-silver-book.
     Google Scholar
  18. International Federation of Consulting Engineers (FIDIC) (2019). The FIDIC golden principles (1st Edition). Geneva: International Federation of Consulting Engineers https://fidic.org/books/epcturnkey-contract-2nd-ed-2017-silver-book.
     Google Scholar
  19. Back, W. E., & Moreau, K. A. (2000). Cost and schedule impacts of information management on EPC process. Journal of management in engineering, 16(2), 59-70.
     Google Scholar
  20. Mahamid, I. (2014). Contractors’ perception of risk factors affecting cost overrun in building projects in Palestine. The IES Journal Part A: Civil & Structural Engineering, 7(1), 38-50.
     Google Scholar
  21. Mahamid, I., & Bruland, A. (2012). Cost deviation in road construction projects: The case of Palestine. Australasian Journal of Construction Economics and Building, The, 12(1), 58.
     Google Scholar
  22. Love, P. E., Wang, X., Sing, C. P., & Tiong, R. L. (2013). Determining the probability of project cost overruns. Journal of Construction Engineering and Management, 139(3), 321-330.
     Google Scholar
  23. Lovallo, D., & Kahneman, D. (2003). Delusions of success. Harvard business review, 81(7), 56-63.
     Google Scholar
  24. Jones, L. R., & Euske, K. J. (1991). Strategic misrepresentation in budgeting. Journal of Public Administration Research and Theory, 1(4), 437-460.
     Google Scholar
  25. Welde, M., & Odeck, J. (2017). Cost escalations in the front-end of projects–empirical evidence from Norwegian road projects. Transport Reviews, 37(5), 612-630.
     Google Scholar
  26. Yin, R. (1993). Applications of case study research. Beverly Hills, CA: Sage Publishing.
     Google Scholar
  27. Fisher, I., & Ziviani, J. (2004). Explanatory case studies: Implications and applications for clinical research. Australian Occupational Therapy Journal, 51(4), 185-191.
     Google Scholar
  28. Noor, K. B. M. (2008). Case study: A strategic research methodology. American journal of applied sciences, 5(11), 1602-1604.
     Google Scholar
  29. Grosse, H. (2019). An insider’s point of view: autoethnography in the construction industry. Construction Management and Economics, 37(9), 481-498.
     Google Scholar
  30. Pink, S., Tutt, D., Dainty, A., & Gibb, A. (2010). Ethnographic methodologies for construction research: knowing, practice and interventions. Building Research & Information, 38(6), 647-659.
     Google Scholar
  31. Rui, Z., Cui, K., Wang, X., Chun, J. H., Li, Y., Zhang, Z., ... & Patil, S. (2018). A comprehensive investigation on performance of oil and gas development in Nigeria: technical and non-technical analyses. Energy, 158, 666-680.
     Google Scholar
  32. Ashton, P. & Gidado, K. Bidua (2001, September). Risk associated with inadequate site investigation procedures under design and build procurement systems. In Proceedings of Association of Researchers in Construction Management (ARCOM) conference. http://www.arcom.ac.uk/-docs/proceedings/ar2001-961-969_Ashton_and_Gidado.pdf.
     Google Scholar
  33. Hagan, G., Bower, D., & Smith, N. (2011). Managing complex projects in multi-project environments. In C. a. L. Egbu, ECW (Chair), Symposium conducted at the meeting of the 27th Annual ARCOM Conference, Bristol, UK.
     Google Scholar
  34. Creedy, G. D., Skitmore, M., & Wong, J. K. (2010). Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of construction engineering and management, 136(5), 528-537.
     Google Scholar
  35. Cantarelli, C. C., Molin, E. J., van Wee, B., & Flyvbjerg, B. (2012). Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases. Transport Policy, 22, 49-56.
     Google Scholar